The Tridge Monster – RAFT UPDATE


image

image

image

image

Tonight I did a lot of work on the raft. I sealed the caps with silicon caulk on 78 milk jugs. Then, using a gel based contact cement, attached them all to the bottom of the raft. I will be securing them even more with chicken wire. So far the left and right had sides have been secured with chicken wire.

Advertisements

No Responses to “The Tridge Monster – RAFT UPDATE”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: